Thank you to everyone that was able to attend the presentation for trail neighbors by the Town’s engineering firm, Stantec, on April 12. The feedback generated during the break-out sessions will be especially helpful to Stantec and the Design and Construction Advisory Committee as they move into the preliminary trail design phase of the project.

In case you missed the meeting, the presentation file is available for download from the project website. You can download the presentation directly here.

The trail alignment is a precursor to the preliminary design review which means this particular phase does not include design details.